Skip to main content

Standard Ceme-Tube Product Details

Made from partially recycled HDPE plastic and available in 8", 10", 12", 18", 24", and 30" diameters, Ceme-Tube LLC's Standard Ceme-Tube™ will change the way footings and piers are made. This revolutionary new product will eliminate many problems old cardboard tubes have.

 

The Ceme-Tube® will not only take job site and shipping abuse, but they can be installed, completely backfilled, and filled with concrete at any future date. All Standard Ceme-Tube® products are four feet in length, but with the integral collar on one end, and can be stacked to produce piers up to 20' tall in one pour or 12' tall for 30" models. The finished pier will be round, smooth, equal in diameter, and of architectural grade for the entire length.

 

An optional domed cap is available in all sizes to keep rain, dirt, children, and more out of the hole prior to pouring concrete.

 

Our non-ribbed Standard Ceme-Tubes are available in 8", 10", and 12" only. Gen 2 Ceme-Tubes with reinforcement ribbing are now available in 18", 24", and 30" Ceme-Tubes.

 

Contact Ceme-Tube LLC for more details.


ADDITIONAL DETAILS


•Impervious to moisture before and after pouring
•Eliminates “friction frost heaving” in colder climates
•Can be installed, completely back-filled, and then filled with concrete at any future date
•Can easily handle job site and shipping abuse without losing integrity
•All models are four feet in length but can be stacked to achieve 20-foot tall piers and footings and can be 12-foot tall for the 30-inch model
•Molded from partially recycled HDPE plastic and is flexible to -103°F
•Will not chip or crack when cold
•Unlike cardboard tubes, the diameters are uniform from one Ceme-Tube® to another
•Easily cut with common power tools
•Can easily be stripped using a grinder with any type of cutting or grinding wheel
•Works well for underwater dock piers
•Will work in conjunction with all manufactured footing bells like Bigfoot
•Optional domed top caps are available for all sizes for prior to pouring
•Finished pier will be round, smooth, and of architectural grade
•No more rotating form lines as with cardboard tubes
•When stripping, only cut the Ceme-Tube® approximately 90% through, score inside cut with a utility knife, and tube will split open with minimal effort